Boston Landmarks Commission Hearing 07/23/2019
The commission will hold its monthly design review public hearing on Tuesday, July 23, 2019.
USE CONGRESS STREET AS AN ENTRANCE/EXIT AFTER 5:30 P.M.
Discussion Topics
-
Design Review - 4:00 PM
19.1428.181 Old Corner Bookstore, 3 School Street
Applicant: Harrison Schell, Property Manager
Proposed work: Installation of exterior intercom system19.1432.179 North Market Building, 7 Faneuil Hall
Applicant: Lauren Cronin, Contractor
Proposed work: Installation of Awning for Sunglass Hut19.1326.108 U.S. Custom House
Applicant: Susan Knack-Brown, Simpson Gumpertz & Heger
Proposed work: Replacement of clock hands (continued)19.1932.265 Old North Church
Applicant: Stephen Ayres, Old North Foundation, of Boston, Inc.
Proposed work: Repair of windows; replacement of gift shop roof in-kind; installation of accessibility ramp to crypt20.009.245 Harvard Medical School, 25 Shattuck Street
Applicant: Meaghan Doyle, Harvard University Medical School
Proposed work: Comprehensive master signage plan -
Administrative Review/Approval
19.1315.BSR/BBW 475 Commonwealth Avenue
Applicant: Panos Demeter, Manager
Proposed work: Replacement of existing awnings19.1381.BSR/BBW 23 Bay State Road #6
Applicant: Trey Zaharek, Contractor
Proposed work: Replacement in-kind of four windows19.1391.MHT 10 Worthington Street
Applicant: Harris Gaceric, Capital Construction Contracting, Inc.
Proposed work: Replacement of existing roofing and corbels19.1420.229 Charles River Esplanade
Applicant: Lev McCarthy, Esplanade Association
Proposed work: Temporary installation of murals on pumphouse19.1429.95 Richards Building, 112-116 State Street
Applicant: William Mosakowski, Servia LLC
Proposed work: Sidewalk reconstruction19.1431.175 The Old Statehouse, 206 Washington Street
Applicant: David Rodrigues, Facilities Manager
Proposed work: Relocation and installation of two interior security cameras19.1462.99 Boston Public Library, 700 Boylston Street
Applicant: David Hoogasian, Extenet Systems, Inc.
Proposed work: Replacement of utility pole and installation of antenna20.004.142 Emerald Necklace Parks, Jamaica Pond
Applicant: Robert Rottenbucher, BPRD
Proposed work: Installation of temporary shoring at the Jamaica Pond Boat House19.1372.149 Gibson House, 137 Beacon Street
Applicant: Jacqueline Blombach, Gibson Society, Inc.
Proposed work: Replacement of red carpet in the study20.015.5 Boston Public Garden
Applicant: Elizabeth Vizza, Friends of the Public Garden
Proposed work: Replacement of benches20.023.142 Sears Building, 401 Park Drive
Applicant: Chris Caine, Development Manager
Proposed work: Trillium and Blick signage -
Business Hearing - 6:00 PM
1. Discussion and vote on Design Review Applications
2. Review and ratification of meeting minutes from 06/25/2019.
3. Advisory Review: 19.1419.CPA Sociedad Latina, Inc., 1530 Tremont Street
Applicant: Alexandra Oliver-Davila, Executive Director
Proposed work: Work funded by CPA includes storefront and window replacement; mechanical, solar, and elevator roof-level alterations; envelope repairs4. Updates
- Projected Adjournment - 7:30 PM