Boston Landmarks Commission
The Commission will hold its next public hearing on Tuesday, January 26, 2021, at 4 p.m.
Please note: This hearing will be held virtually and not in person. To participate, please go to our Zoom Meeting link, or call 301-715-8592 and enter meeting ID 849 3912 2307 #. You can also email comments through email at blc@boston.gov.
Discussion Topics
-
Design Review - 4:00pm
21.0546.0042 Franklin Park - 1 Franklin Park Road: This application is amending Application #18.606.42.- amendment to the Installation of a cart boardwalk currently under construction at the William Devine Golf Course.
21.0570.0056 Back Bay Fens - Park Drive and the Fenway: Installation of 15 multi-space electronic parking meter pay stations along Park Drive and the Fenway.
21.0541.0085 Wang Theater - 270 Tremont Street: Elevator upgrade, including ADA accessible ramp from a proposed elevator lobby to the existing basement lobby.
-
Administrative Review/Approval
21.0502.0091 Berkeley Building - 422 Boylston Street: Replace existing wall signs.
21.0545.0005 Public Garden - Beacon Street: Repairs, refurbishments, and reconstruction of the one half of the existing entry gate of the intersection of Charles St and Boylston St.
21.0544.0073 Theodore Parker Unitarian Church: 70 Corey Street, West Roxbury: At Parish Hall installation of automatic door opener and roof cap.
-
Business Hearing - 6:00pm
1) Discussion and vote on Design Review Applications: The Design Review Committee will present summaries of applications and make recommendations for a vote on each agenda item discussed at the Design Review Hearing, which met earlier.
2) Demolition Delay Hearing: 38 Lexington Street, East Boston (Application #20.701D2597): Review of proposed demolition of the existing house at 38 Lexington Street.
3) Demolition Delay Hearing: 411 East 3rd Street, South Boston (Application #21.0059D2675): Review of proposed demolition of the existing house at 411 East 3rd Street.
4) Advisory Review: Eustis Street Area Historic District Protection Area: Construction of 145 foot tall building at 2085 Washington Street.
5) Review and ratification of hearing minutes from 12/8/2020 and 1/12/2021.
6) Staff Updates
7) Projected Adjournment - 8:00pm